Dean S. Brockbank (usb 7149)
Rocky Mountain Power, a Division of PacifiCorp
201 South Main, Suite 2200
Salt Lake City, UT 84111
Telephone: (801) 220-4568
Gary G. Sackett (usb 2841)
Jones Waldo Holbrook & McDonough, pc
170 S. Main Street, Suite 1500
Salt Lake City, Utah 84101
Telephone: (801) 534-7336
Attorneys for Rocky Mountain Power, a Division of PacifiCorp
Submitted: August 9, 2006
BEFORE THE PUBLIC SERVICE COMMISSION OF UTAH
In the Matter of an Investigation into Pole Attachments |
))))) ) ) ) |
DOCKET NO. 04-999-03 Responsive Comments of Rocky Mountain Power on Proposed Change to Rule R746-345-3
|
On August 1, 2006, Comcast Cable Communications, llc (“Comcast”), and the
Utah Rural Telecom Associations (“urta”) filed comments with the Commission in the
captioned proceeding. Their comments addressed proposed changes to the Commission’s Rules R746-345-2 and -3 (Utah Admin. Code §§ R746-345-2, -3) that were
published in the July 1, 2006, Utah State Bulletin (the “July 1 Proposal”). Rocky Mountain Power, a Division of PacifiCorp (formerly PacifiCorp, dba Utah Power) respectfully
submits the following responsive comments.
Background. In the December 15, 2005, edition of the Utah State Bulletin, the Commission published extensive changes to the rules governing attachments to poles owned by utility companies “to clarify the intent and result of the rule modification previously proposed” and make changes to “areas of possible confusion and ambiguity.”
In the May 1, 2006, publication of the Utah State Bulletin, the Commission proposed further modifications to Utah Admin. Code § R746-345-3.C, concerning alternative make-ready work bids by the pole owner; and to § R746-345-3.C.8, concerning access to the electrical utility space in connection with the “self-build option” (the “May 21 Proposal”).
The Commission’s July 1 Proposal primarily addresses the self-build, make-ready issues in § R746-345-3.C. Rocky Mountain Power addresses briefly the issues raised by urta and Comcast.
The electrical utility space. In the May 21 Proposal, the Commission had proposed to recognize Rocky Mountain Power’s (then PacifiCorp’s) concern over the overriding safety considerations of allowing attaching entities such as Comcast to self-build the make-ready work in the electrical utility space of a pole by incorporating this sentence in subsection 3.C.8: “The self-build option is available only for make-ready work outside of the electrical utility space.”
The July 1 Proposal removed this sentence, but effected a similar result by modifying subsection 3.C to require that the pole owner concur with an attacher’s request to self-build the make-ready work related to its attachment request:
Applicants that wish to consider self-building shall inform the pole owner at the time of application that they are considering the self-build option, if available, and they would like a two-alternative make-ready bid. The pole owner and each existing attaching entity are responsible to determine what portion, if any, of the make-ready work their facilities require which may be performed through a self-build option and what conditions, if any, are associated with such self-build option. In the first alternative, the pole owner and attaching entities would be responsible for all necessary make-ready work. For the second alternative, the pole owner and attaching entities will identify what make-ready work they will perform, if any, with an associated cost estimate, and also identify what make-ready work, if any, the owner is agreeable to have performed through a self-build option and the conditions, if any, for such self-build option.
(Emphasis added.)
Rocky Mountain Power regards this proposed change as a reasonable alternate to the May 1 Proposal. As before, Rocky Mountain Power believes it is absolutely necessary for the electric company to have exclusive control of the electric utility space on electric poles. As Rocky Mountain Power reads the Commission’s July 1 Proposal, it leaves the decision to allow self-build of make-ready work in the electrical space on electric poles in the hands of the electric utility. This appropriately reflects concern for the electric customers where considerations of safety, quality control and adherence to National Electric Safety Code (NESC) requirements and standards on electric poles necessitate the limitation that the Commission has proposed.
Comcast Cable Communications. Comcast’s comments are largely not related to the changes published on July 1. Rather, they consist of a reprise of issues that Comcast had raised in previous rounds of rulemaking comments on issues that the Commission has already decided. For example, on page 2 of its comments, Comcast takes issue with the provision that permits the pole owner to modify the specific make-ready dates detailed in § R746-345-3.C if it provides an appropriate explanation of its need to do so. This Commission had already adopted this provision; it was not part of the Commission’s proposed July 1 rule changes.
In its comments, Comcast, in effect, creates a straw man by attaching the inapposite term “open-ended” to the detailed procedure that the Commission has adopted to deal with the oftentimes complicated make-ready process. It then attempts to bring the straw man down by painting the picture of a predatory pole owner who will openly flout the Commission’s carefully crafted regulatory structure in this area, twist the Commission’s rules to its own competitive advantage, thwart Comcast’s ability to serve its potential customers, and leave the Commission powerless to take remedial action against the pole-owner’s hypothetical misbehavior.
The Commission has gone to considerable length to arrive at a balanced pole-attachment system that (a) accommodates the efforts of non-pole-owners who wish to provide non-utility services to the public and to use utility property in doing so, (b) allows the public utility to operate and control its utility property with the primary mission of providing safe and reliable service to its utility customers, and (c) provides a regulatory mechanism under which the Commission has the tools to remedy any abuse or misuse of the system by the utility pole-owner. To suggest, as does Comcast in its most recent comments, that the Commission will be besieged with a constant stream of requests to sort out endless bickering between owners and attachers assumes the most nefarious of motives on the part of the electric utility, the purest of intentions and actions on the part of the attaching party, and the inability of the Commission to cope in a timely and effective fashion with any problem that might arise between the two protagonists in such a drama.
There is, of course, no evidence to support this hypothetical parade of horribles. Comcast continues to base its arguments on the somewhat paranoiac expectation that the electric utility will try to sabotage its business plans. The electric utility in this case is focused on electric utility service for Utah customers. It is ready and willing to accommodate other service providers who wish to make attachments to its facilities, but it must have the flexibility and control to provide safe utility service first. The Commission’s make-ready framework provides a reasonable trade-off between the interests of the utility customers and the communications customers of a non-utility enterprise. Comcast should—in the absence of any evidence to the contrary—assume that the Commission will properly enforce the rules that it adopts.
Under the reasonable conclusion that the electric utility must, as a matter of
providing safe service to customers, have direct responsibility for the electric space, the
Commission has, since its February 8, 2006, “Order Granting Temporary Exemption” in
this docket,
implemented that conclusion. The July 1 Proposal did not change that
perspective, and Comcast’s comments are merely retreads of its comments to the Commission in the previous proposed rule changes. Indeed, the July 1 proposal takes the
somewhat more flexible view that, while the electric utility is responsible for the electrical space on a pole in the first instance, there might be mutually agreeable circumstances
where it could agree to allow applicant attachers to self-build make-ready work in the
electrical space. But, the fundamental principle is that such an arrangement must be
agreeable to the party responsible for the safety of the installations—the electric utility
pole owner.
Utah Rural Telecom Association. urta’s comments would have the Commission step backward and resurrect the approved-contractor-list approach to self-build situations. The Commission concluded as early as February 8 of this year, in its Order Granting Temporary Exemption that electric utilities would not be required to permit self-build make-ready work by others in the utility’s electrical space. The Commission’s May 1 proposal incorporated this provision directly, and the July 1 Proposal embodies the same concept in modified form. The Commission has concluded that the electric company’s responsibilities to its customers do not allow it to cede its safety and quality-control responsibilities to other attachers. The Commission has previously both directly and implicitly rejected the essence of urta’s proposal, and it should do so again.
Clarification. Comcast has suggested a minor modification to the last two sentences of the first paragraph of subsection 3.C to distinguish between existing and prospective attachers. Rocky Mountain Power agrees with Comcast that the language should be clarified, but Comcast’s proposed changes don’t quite do the trick. The following perhaps better captures Comcast’s suggestion:
In the first alternative, the pole owner and attaching entities with existing attachments would be responsible for performing all necessary make-ready work. For the second alternative, the pole owner and attaching entities with existing attachments will identify what make-ready work they will perform, if any, with an associated cost estimate, and also identify what make-ready work, if any, the owner is agreeable to have performed through a self-build option and the conditions, if any, for such a self-build option.
Wherefore, Rocky Mountain Power supports the Commission’s July 1 Proposal, as slightly modified in the foregoing paragraph, as the final rule on self-building of make-ready work on electric poles.
Submitted this 9th day of August 2006.
Rocky Mountain Power,
a Division of PacifiCorp
_________________________________
Gary G. Sackett
Jones Waldo Holbrook & McDonough
Dean S. Brockbank
Rocky Mountain Power,
a Division of PacifiCorp
Certificate of Service
I certify that on August ____, 2006 a copy of the foregoing Comments of Rocky Mountain Power on Proposed Change to Rule R746-345-3 was sent by U.S. Mail or by e-mail in pdf format to the following participants in PSCU Docket No. 04-999-03:
Michael L. Ginsberg
Patricia E. Schmid
Assistant Attorneys General
Counsel for the Division of Public Utilities
mginsberg@utah.gov
pschmid@utah.gov
Committee of Consumer Services
160 East 300 South
Salt Lake City, UT 84111
Martin J. Arias
Comcast Cable Communications
Counsel for Comcast Cable Communications
Jerold G. Oldroyd
Angela W. Adams
Ballard Spahr Andrews & Ingersoll
Counsel for Comcast Cable Communications
Bradley R. Cahoon
Snell & Wilmer LLP
Counsel for Voicestream PCS II
Corporation, dba T-Mobile
bcahoon@swlaw.com
Robert C. Brown
Melissa Thompson
Teresa Atkins
Qwest Corporation
Counsel for Qwest Corporation
Robert.Brown@qwest.com
Melissa.thompson@qwest.com
Theresa.atkins@qwest.com
Stephen F. Mecham
Callister Nebeker & McCullough
Counsel for Utah Rural
Telecom Association
sfmecham@cnmlaw.com
Charles Best
Electric Lightwave, LLC
Counsel for Electric Lightwave, LLC
charles.best@eli.net
Mr. Michael Peterson
Representing Utah Rural
Electric Association
mpeterson@utahcooperatives.org
Meredith R. Harris
AT&T Corp.
Counsel for AT&T Corp.
harrism@att.com
Gregory J. Kopta
Davis Wright Tremaine LLP
Counsel for XO Utah, Inc.
gregkopta@dwt.com
Curt Huttsel, Ph.D.
Electric Lightwave LLC
CHuttsel@czn.com
LaDell Laub
Dixie Escalante Rural Electric Association
ladell@scinternet.net
Eric Guidry
Land and Water Fund
Boulder, Colorado 80302
Danny Eyre
Bridger Valley Electric Association Inc.
derye@bvea.net
Carl Albrecht
Garkane Energy Cooperative Inc.
calbrecht@garkaneenergy.com
Kathy Sorg